Construction of Eight Lane access controlled expressway starting from Bhamaiy aVillage and ends in Baletiya village in Panchmahal district (ch. 780+920 to 803+420, design ch. 328+500 to 351+000) section of Delhi-Vadodara Greenfield Alignment (NH-148 N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat (Package – 29)
2×37.28m RDSO standard Steel Composite Girder in the ROB. 35m PSC Girder-Slab System in the Viaduct (with a deck width of 2×21.5m). These structural elements are supported by 14 Pile Groups (1m dia).
Plot-100, 2nd Floor, Okhla Industrial Estate, Phase-III, New Delhi – 110020