3 Major Bridges and 1ROB cum Flyover, Delhi Vadodara Package 29, Gujrat

3 Major Bridges and 1ROB cum Flyover, Delhi Vadodara Package 29, Gujrat

Construction of Eight Lane access controlled expressway starting from Bhamaiy aVillage and ends in Baletiya village in Panchmahal district (ch. 780+920 to 803+420, design ch. 328+500 to 351+000) section of Delhi-Vadodara Greenfield Alignment (NH-148 N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat (Package – 29)

2×37.28m RDSO standard Steel Composite Girder in the ROB. 35m PSC Girder-Slab System in the Viaduct (with a deck width of 2×21.5m). These structural elements are supported by 14 Pile Groups (1m dia).

Project Gallery

Project Status

Ongoing

Start Date

April 2021

Location

Vadodara, Gujarat

Type

Elevated Structure