784 M Long Bridge Over River Yamuna at Kalpi, UP

784 M Long Bridge Over River Yamuna at Kalpi, UP

784 M long two lane balanced cantilever Pre Stressed Bridge over well foundations by Pre-cast segmental construction methodology using Launching Girder weighing  800 MT.3 Nos Well Curb using FLOATING CAISSON METHODOLOGY. It consists of 7 spans of 85 M, 2 Spans of 52 M each and 2 Spans of 42.5 M each. 

Project Gallery

Project Status

Completed

Start Date

November 2007

Location

Kalpi, UP

Type

River Bridge