784 M long two lane balanced cantilever Pre Stressed Bridge over well foundations by Pre-cast segmental construction methodology using Launching Girder weighing 800 MT.3 Nos Well Curb using FLOATING CAISSON METHODOLOGY. It consists of 7 spans of 85 M, 2 Spans of 52 M each and 2 Spans of 42.5 M each.
Plot-100, 2nd Floor, Okhla Industrial Estate, Phase-III, New Delhi – 110020